Pillar 01 · 7 systems

Automation & Control

The logic layer the rest of the building answers to

01.01

Commercial automation & unified control

  • Control architecture and interlock matrix at design stage
  • Local processors — no cloud dependency for core function
  • Scene programming built around actual occupancy patterns

01.02

Lighting control

  • Zoning drawn from occupancy patterns, not panel convenience
  • Occupancy and daylight sensing where it pays back
  • Scene programming and astronomical time-clock schedules

01.03

Architectural & façade lighting

  • Fixture layout designed to real sightlines and viewing distance
  • Weatherproof, thermally-rated exterior specification
  • Sequence and colour programming, including festival presets

01.04

Motorised shading

  • Motor and tube specification sized to span and fabric weight
  • Coordination with façade and ceiling trades at shell stage
  • Sun-tracking, schedule and scene control

01.05

HVAC & climate integration

  • Integration over the plant's native control interface
  • Occupancy-linked and schedule-based operation
  • Setpoint limits and override rules

01.06

Building Management System (BMS)

  • Points list and alarm matrix agreed before installation
  • Site graphics and floor-level dashboards
  • Trend logging and scheduled reporting

01.07

Energy monitoring

  • Sub-meter placement mapped to tenancy or cost-centre boundaries
  • Consumption dashboards with daily and monthly profiles
  • Automated reporting to finance or facilities

Planning automation & control for a project?

Send the scope and stage. We reply within one working day.